background preloader

Botball

Facebook Twitter

2013 Botball Overview. Lego Technic 4 Speed Gear Change Transmission.wmv. LEGO Differential - How it Works. Simple Lego Differential Car Application, rear wheel drive with power function. BotBall 2013 | Al Khor International School. Botball | Tarzan 13-0623 HTL-Donaustadt. Www.cs.uml.edu/~holly/teaching/91450/fall2011/Sensor_and_Motor_Manual_BB2011.pdf. Education LEGO Education downloads. Final Battle: 2013 Botball California Southern Region (Greater San Diego) Drive Trains | normanadvanced.com. The drive train is the most important part of any Lego robot. Without a good drive train, robots will fall apart and run inconsistently. In Botball, there is now a metal piece that provides a somewhat rigid and stable base for Lego robots.

Unfortunately, this piece has its limits. Not only is the metal that mounts the wheel motors able to bend, the base itself also hinders creative robot design. Drive Train (Basic) Wheel Mounting. Decisions… Decisions… | P:Y:R. Botball 2013. Alcott versus Whittier 48 Botball 2013 R3. Alcott Middle School Botball 2013 Tournament R1.

1. Botball Programming Tutorial. Botball 2013 Oklahoma Regional DE Final Round: Whittier MS vs. Classen School of Advanced Studies.

Game Review 2013

Timelines/Deadlines. Things we need. Safety. Notes on Botball Videos. Goals. Designs. 2013 Botball Game Video. Regional Tournaments | Botball® Educational Robotics Program. Participants' robots compete with each other on a custom playing field in a fast paced, non-destructive regional tournament. The robots are student built and programmed to maneuver on the game board without the need for remote control.

Each regional tournament consist of: Exciting Tournament Action Regional tournaments are held approximately 7-9 weeks after the regional workshops. During that 7-9 week period, students build, program and document a pair of autonomous robots to compete at the tournament. Precision Seeding Rounds In the morning, teams compete unopposed on the game board as their robots attempt to score as many points as they can. Head-to-Head Double Elimination The action heats up in the afternoon as teams go head-to-head in the double elimination rounds.

Creative Onsite Presentations During the 7-9 week building process, teams are required to document their engineering process in an online project documentation area. Awards Ceremony. Differential gear by Lego parts.